Light Rail for Cheviot is Cheviot Hills
Homeowners advocating use of the existing “Exposition Right of Way” south of
Northvale Road at the edge of our neighborhood
2. Where are we in the Process? Hasn’t a
route already been chosen?
Having heard community concerns through Scoping
Meetings (Winter 2007), a “Draft Environmental Impact Statement” (required by
federal law) and “Draft Environmental
Impact Report” (required by state law) will be issued. The draft document (together “Draft EIS/R”)
should be done in about late 2008. It
will discuss all of the comments received through Scoping, and it will include
traffic, safety, and environmental issues.
It will also propose mitigations, such as grade separations and station
locations. After it is released, the
community will again be asked for input.
Metro will issue a Final EIR/EIS (scheduled in Fall
2009) Based on the Draft EIS/R and comments.
If construction is funded, it could begin at about the time that Expo
Phase 1 opens in 2010 and be completed by about 2014-2015.